Engineering Works 2007
Welcome to scot-rail.co.uk, Scotland's online railway community. The group is for any rail enthusiast interested in the railways and trains of Scotland. It not only consists of the wiki that you're reading now, but a busy online forum and mailing list, which is accessible to anyone who registers. If you would like to join in, all you have to do is register with us for free.
Breadcrumb navigation
Planned Engineering Work during 2007.
Planned daytime line blockages, and service alterations.
There is also ongoing work at Edinburgh Waverley.
Saturday 26th May
Cross-Border Service Alterations:
- GNER trains start/terminate at Peterborough (from 14.15)
Sunday 27th May
Main Worksites:
- Carmuirs E - Carmuirs W (track renewal, down line)
- Edinburgh/Dunblane - diverted to Falkirk High, Replacement Bus Falkirk - Dunblane
- Glasgow Queen St/Aberdeen: diverted via Tay Bridge, Fife, Falkirk High
- Glasgow Queen St/Inverness/Elgin: diverted via Ladybank, Fife, Falkirk High
- GNER Inverness/London KX: via Fife
- Caledonian Sleeper Inverness-Euston: via Fife
- DRS Grangemouth/Aberdeen: cancelled, EWS 6H44: via Fife
Main Worksites:
- Lambhill & Summerston (track renewal)
- Glasgow Queen St/Oban/Mallaig: diverted to Glasgow Queen St Low Level
- 1B01 Fort William - Edinburgh Sleeper: diverted via Glasgow Central Low Level
Cross-Border Service Alterations:
- GNER trains start/terminate at Peterborough
Sunday 3rd June
Main Worksites:
- Haymarket East (Up South Line - track renewal)
- Edinburgh/West Calder: Bus Replacement
- Edinburgh/Bathgate/Dunblane: diverted via Edinburgh Sub
- Edinburgh/Glasgow Queen St: up to 13:00 via Sub, after 13:00 via Dalmeny
- Edinburgh/Fife/Dundee/Aberdeen/Inverness: up to 13:00 via Edinburgh Sub
- No GNER trains to Glasgow Central
Sunday 10th June
Main Worksites:
- Haymarket (Platform 3, Up South Line - track renewal)
- Edinburgh/West Calder - Bus Replacement
- Edinburgh/Bathgate/Dunblane - Diverted via Edinburgh Sub
- Edinburgh/Glasgow Queen St - Diverted via Dalmeny
- GNER Inverness/London KX via Fife
- Virgin (to Glasgow/Carlisle) diverted via Edinburgh Sub, not calling at Haymarket
- No GNER trains to Glasgow Central
Cross-Border Service Alterations:
- Virgin trains on WCML replaced by Bus between Lancaster/Carlisle (untill 14:00)
Sunday 17th June
Main Worksites:
- Hyndland East Junction (S&C tamping) until 12:20
- Helensburgh Central/Drumgelloch services start/terminate at Partick and Anniesland
- Motherwell/Balloch/Milngavie start/terminate at Exhibition Centre and Anniesland
- Anniesland/Balloch service via Hyndland N - W chord.
- Bus link between Anniesland - Exhibtion Centre (until 13:00)
Main Worksites:
- Breich (Up line Track renewal)
- Edinburgh/West Calder: retimed with Single Line Working
Sunday 24th June
Main Worksites:
- Breich (Up line Track renewal)
- Edinburgh/West Calder: retimed with Single Line Working
Main Worksites:
- Clifton, between Newbridge Jn - Cawburn Jn (Down line Track renewal)
- Edinburgh/Bathgate: replaced by bus service
Sunday 1st July
Main Worksites:
- Breich (Up line Track renewal)
- Edinburgh/West Calder: retimed with Single Line Working
Main Worksites:
- Newbridge Jn - Bathgate (A2B project)
- Edinburgh/Bathgate: replaced by bus service
Main Worksites:
- near Dalgety Bay (Down line track renewal, between 14m571yds and 14m985yds)
- Edinburgh-Aberdeen/Inverness - diverted via Dunfermline & Glenrothes
- Fife Circle: outers terminate at Glenrothes, inners terminate at Inverkeithing
- replacement bus via Kirkcaldy.
Sunday 8th July
Main Worksites:
- Breich (Up line Track renewal)
- Edinburgh/West Calder: retimed with Single Line Working
Main Worksites:
- near Dalgety Bay (Down line track renewal, between 14m985yds and 14m1399yds)
- Edinburgh-Aberdeen/Inverness - diverted via Dunfermline & Glenrothes
- Fife Circle: outers terminate at Glenrothes, inners terminate at Inverkeithing
- Replacement bus via Kirkcaldy.
Saturday 14th July - Friday 20th July
Main Worksites:
- Gretna-Annan line re-doubling.
- Drumlanrig tunnel repairs
- Mauchline S&C renewal, Thornhill S&C renewal
- Replacement bus Carlisle - Dumfries, Kilmarnock.
- No coal trains running.
Sunday 15th July
Main Worksites:
- near Dalgety Bay (Down line track renewal, between 14m1399yds and 15m53yds)
- Edinburgh-Aberdeen/Inverness - diverted via Dunfermline & Glenrothes
- Fife Circle: outers terminate at Glenrothes, inners terminate at Inverkeithing
- Replacement bus via Kirkcaldy.
Main Worksites:
- Carfin (Down line track renewal, between 1m842yds and 2m56yds)
- No Freight trains through Holytown
Cross-Border Service Alterations:
- GNER trains diverted via Leeds until midday
Monday 16th July - Tuesday 17th July
Main Worksites:
- Kirkliston (on Winchburgh-Dalmeny line) Track renewal.
- No Glasgow - Kirkcaldy ?
- No coal trains running (Longannet shutdown)
Saturday 21st July - Friday 27th July
Main Worksites:
- Gretna-Annan line re-doubling.
- Thornhill S&C renewal
- Drumlanrig tunnel repairs
- Mossiegiel Up track renewal
- Ballochmyle Down track renewal
- Replacement bus Carlisle - Dumfries, Kilmarnock.
Monday 23rd July - Friday 27th July
Main Worksites:
- Inverkeithing Central Junction S&C renewal
- North Queensferry Tunnel track renewal
- Edinburgh - Aberdeen/Dyce, divert via Stirling
- Edinburgh - Inverness: change at Perth.
- half-hourly Edinburgh/Dalmeny shuttle
- hourly Glenrothes - Cowdenbeath - Kirkcaldy - Dundee (& v/v)
- hourly Glenrothes - Cowdenbeath - Kirkcaldy - Glenrothes (& v/v)
- (above use Inverkeithing north curve)
- GNER/Virgin Trains: terminate/start at Edinburgh
Friday 27th July
Main Worksites:
- Edinburgh Waverley remodelling
- Inverness/Aberdeen/Fort William Sleeper: split/join at Braidhurst (Motherwell)
- Edinburgh - Carstairs portion dep earlier and via Sub?
Saturday 28th July - Sunday 29th July
Main Worksites:
- Inverkeithing Central Junction S&C renewal
- North Queensferry Tunnel track renewal
- Edinburgh Waverley remodelling: Mound Tunnels X and Y blocked.
- Edinburgh - Aberdeen/Dyce, Inverness divert via Stirling
- hourly Glenrothes - Cowdenbeath - Kirkcaldy - Dundee (& v/v)
- hourly Glenrothes - Cowdenbeath - Kirkcaldy - Glenrothes (& v/v)
- (above use Inverkeithing north curve)
- replacement bus Haymarket - Dalgety Bay
- Edinburgh - Glasgow Queen St: reduced to half hourly.
- GNER/Virgin Trains (for Glasgow Central/Aberdeen): terminate/start at Edinburgh
- GNER Inverness: divert via Edinburgh Suburban line.
- Virgin Trains from WCML: divert via Edinburgh Suburban line.
Saturday 28th July - Sunday 29th July
Main Worksites:
- Gretna-Annan line re-doubling.
- Drumlanrig tunnel repairs
- Ballochmyle Down track renewal
- Replacement bus Carlisle - Dumfries, Kilmarnock.
Sunday 29th July
Cross-Border Service Alterations:
- Sleeper services via ECML
Sunday 5th August
Main Worksites:
- Heatherbell (Gartsherrie S - Garnqueen N) track renewal
- Sunday night freight via Springburn.
Main Worksites:
- Track renewal through Kilmarnock Platform 3
- Track renewal at Barrhead 7m 1265y - 8m 859y
- Underbridge replacement at Lugton
- Glasgow Central - Carlisle: 2 trains each way diverted via Newton-on-Ayr and Mauchline.
- Bus replacement Glasgow - Kilmarnock/Auchinleck
Cross-Border Service Alterations:
- Sleeper services via ECML
Saturday 11th August - Sunday 12th August
Main Worksites:
- Underbridge replacement at Lugton
- Saturday: Busses Barrhead - Kilmarnock. FSR Carlisle trains terminate/start at Kilmarnock.
- Sunday: FSR Carlisle trains reverse Barrassie.
Cross-Border Service Alterations:
- Sunday night Sleeper services via ECML
Sunday 19th August
Main Worksites:
- Cockhill (west of Nairn): Track renewal (131m 881y - 132m 396y)
- Bus: Inverness - Elgin
Cross-Border Service Alterations:
- Sunday night Sleeper services via ECML
Saturday 25th August - Sunday 26th August
Main Worksites:
-
Garnqueen North Jn: S&C renewal - Cumbernauld, Up line Track renewal (101m 579y - 101m 1329y)
Service Alterations:
- Bus: Glasgow - Cumbernauld - Falkirk Grahamston
- Bus: Motherwell - Cumbernauld
- Saturday 1Y11 via Lenzie
- Saturday Coal trains via Shotts, Millerhill
- Freight via Springburn.
Sunday 26th August
Cross-Border Service Alterations:
- GNER start/terminate at Peterborough
- Sunday night Sleeper services via ECML
Sunday 2nd September
Main Worksites:
- Cumbernauld, structure FB69A
- Bus: Glasgow - Cumbernauld
- Freight via Springburn.
Main Worksites:
- Burnside: Track renewal, 97m 1402y - 98m 348y (Down Line)
- Bus: Mount Florida - Newton
- Extra Cathcart Circle services
Cross-Border Service Alterations:
- Sunday night Sleeper services via ECML
Sunday 9th September
Main Worksites:
- Inverkeithing Central Junction S&C follow-up Tamping
- Forth Bridge: Structures work
- Busses replace trains until 09:40
- Single Line working on Forth Bridge, Down Line 09:40 - 16:00
Main Worksites:
- Patterton: Drainage work
- Glasgow - Neilston diverted to Kings Park: bus to Neilston.
Saturday 15th - Sunday 16th September
Main Worksites:
- Granshouse North (S&C Renewal)
- East Linton (Track renewal)
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Diesel only
Sunday 16th September
Main Worksites:
- Craigton (near Winchburgh). Rock cutting stabilisation Works
- Bathgate branch (A-B Project)
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Inverkeithing Central Junction S&C follow-up Tamping
- Forth Bridge: Structures work
- Busses replace trains until 09:40
- Single Line working on Forth Bridge, Down Line 09:40 - 16:00
Main Worksites:
- Patterton: Drainage work
- Glasgow - Neilston diverted to Kings Park: bus to Neilston.
Saturday 22nd - Sunday 23rd September
Main Worksites:
- Grantshouse North (S&C Renewal)
- East Linton (Track renewal)
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Diesel only
Sunday 23th September
Main Worksites:
- Bathgate branch (A-B Project)
- Busses: Edinburgh - Bathgate
Main Worksites:
- Plean: ?
- Glasgow Queen St - Aberdeen/Inverness via Fife
- Bus Falkirk High - Stirling - Perth - Dundee
- Edinburgh - Falkirk Grahamston, Bus Falirk G. to Dunblane
Main Worksites:
- Inverkeithing Central Junction S&C follow-up Tamping
- Forth Bridge: Structures work
- Busses replace trains until 09:40
- Single Line working on Forth Bridge, Down Line 09:40 - 16:00
Main Worksites:
- Patterton: Drainage work
- Glasgow - Neilston diverted to Kings Park: bus to Neilston.
Saturday 29th until Friday 5th October
Main Worksites:
- Strathcarron - Kyle: Devegitation and Rock stabilisation, Changing Sleepers
- Inverness - Strathcarron, Bus to Kyle of Lochalsh
Saturday 29th - Sunday 30th September
Main Worksites:
- Portobello Jn and Musselburgh: Track renewal Up line, 3m650y 4m52y
- Lamberton: Re-railing
- Stenton: Follow-up tamping
- Grantshouse: Earthworks
- various OHLE work
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Bus
- Edinburgh - Newcraighall: Bus
Sunday 30th September
Main Worksites:
- Craigton (near Winchburgh): Earthworks, Cable work. Rail changing (32m1220y - 32m700y)
- Bathgate branch (A-B Project)
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Usan: removal of catch points
- Camperdown: Level Crossing work
- Laurancekirk: Drainage work
- Glasgow, Edinburgh - Dundee: bus to Aberdeen
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Saturday 6th until Friday 12th October
Main Worksites:
- Newbridge Junction - Bathgate: A2B project
- Bathgate - Edinburgh: replacement bus service
Saturday 6th until Friday 12th October
Main Worksites:
- Strathcarron - Kyle: Devegitation and Rock stabilisation, Changing Sleepers
- Inverness - Strathcarron, Bus to Kyle of Lochalsh
Saturday 6th - Sunday 7th October
Main Worksites:
- Portobello Jn and Musselburgh: Track renewal Up line, 4m52y 4m1536y
- various OHLE work
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Bus
- Edinburgh - Newcraighall: Bus
Sunday 7th October
Main Worksites:
- Craigton (near Winchburgh): Earthworks, Cable work
- Linlithgow, Newbridge Jn: S&C tamping
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Saturday 13th until Friday 19th October
Main Worksites:
- Newbridge Junction - Bathgate: A2B project
- Bathgate - Edinburgh: replacement bus service
Saturday 13th until Sunday 14th October
Main Worksites:
- Strathcarron - Kyle: Devegitation and Rock stabilisation, Changing Sleepers
- Inverness - Strathcarron, Bus to Kyle of Lochalsh
Saturday 13th - Sunday 14th October
Main Worksites:
- Monktonhall South S&C renewal
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Bus
- Edinburgh - Newcraighall: Bus
Sunday 14th October
Main Worksites:
- Craigton (near Winchburgh): Earthworks, Cable work
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Friday 19th October
Main Worksites:
- Fort William Jn - Mallaig
- 1821 from Glasgow Terminates Fort William
Saturday 20th - Friday 26th October
Main Worksites:
- Fort William Jn - Mallaig: Tunnel work, devegitation, rock cutting stabilisation.
- Bus: Fort William - Mallaig
Saturday 20th
Main Worksites:
- Newbridge Junction - Bathgate: A2B project
- Bathgate - Edinburgh: replacement bus service
Saturday 20th - Sunday 21st October
Main Worksites:
- Monktonhall South S&C renewal
- Portobello Track renewal
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Bus
- Edinburgh - Newcraighall: Bus
Sunday 21st October
Main Worksites:
- Craigton (near Winchburgh): Earthworks, Cable work
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Saturday 27th - Friday 2nd November
Main Worksites:
- Fort William Jn - Mallaig: Tunnel work, devegitation, rock cutting stabilisation.
- Bus: Fort William - Mallaig
Saturday 27th - Sunday 28th October
Main Worksites:
- Dunrobin: Track renewal
- Train: Inverness - Lairg. Bus: Lairg - Wick & Thurso
Main Worksites:
- Dyce, Raith's Farm
- Bus: Aberdeen - Dyce - Inverurie
Main Worksites:
- Monktonhall South S&C renewal
- Portobello Track renewal
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Bus
- Edinburgh - Newcraighall: Bus
Sunday 28th October
Main Worksites:
- Craigton (near Winchburgh): Earthworks, Cable work
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Saturday 3rd - Sunday 4th November
Main Worksites:
- Fort William Jn - Mallaig: Tunnel work, devegitation, rock cutting stabilisation.
- Bus: Fort William - Mallaig
Main Worksites:
- Monktonhall South S&C renewal
- Longniddry Track renewal
- GNER diverted via Edinburgh - Carlisle - Newcastle.
- No Virgin Trains north of Newcastle
- Edinburgh - North Berwick: Bus
- Edinburgh - Newcraighall: Bus
Sunday 4th November
Main Worksites:
- Craigton (near Winchburgh): Earthworks, Cable work
- Glasgow Queen St - Falkirk High, Bus to Edinburgh
- Dunblane - Falkirk Grahamston, Bus to Edinburgh
- 2 trains per hour, Edinburgh - Livingston South - Glasgow Central
- No trains Edinburgh - Bathgate: Busses from Livingston South
- Inverness GNER and 1M16 Sleeper via Forth Bridge.
- 1B01 Fort William - Edinburgh via Glasgow C. LL and Shotts
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Saturday 10th - Friday 16th November
Main Worksites:
- Crianlarich - Oban (various)
- Bus: Crianlarich - Oban
Main Worksites:
- Perth - Inverness (various)
- Bus: Inverness - Perth
- Sleeper diverted via Aberdeen
- GNER terminates Perth (ECS to/from Craigentinny)
More info on Network Rail and First ScotRail websites.
Sunday 11th November
Main Worksites:
- Shields Jn - Arkleston Jn: OHLE work, GARL project
- Ayr, Largs, Gourock, Wemyss Bay - Paisley Gilmour St, bus to Glasgow Central
- Stranraer/Kilmarnock trains amended.
Main Worksites:
Saturday 17th - Sunday 18th November
- Perth - Inverness (various)
- Bus: Inverness - Perth
- Sleeper diverted via Aberdeen
- GNER terminates Perth (ECS to/from Craigentinny)
More info on Network Rail and First ScotRail websites.
Saturday 17th - Friday 23th November
Main Worksites:
- Crianlarich - Oban (various)
- Bus: Crianlarich - Oban
Sunday 18th November
Main Worksites:
- Wishaw: Track Renewal (Up line 85mi 1327yds to 85mi to 267yds)
- Lanark services run mainline. Bus: Wishaw - Motherwell/Carluke
- Freight services run mainline through Motherwell
Sunday 18th November
Main Worksites:
- Springburn: S&C Tamping at Sighthill East and West Junctions
- Garnqueen: Partial S&C renewal
- Glasgow Queen Street - Cumbernauld: bus replacement until 13:00
Main Worksites:
Saturday 24th - Sunday 25th November
Main Worksites:
- Crianlarich - Oban (various)
- Bus: Crianlarich - Oban
Sunday 25th November
Main Worksites:
- Wishaw: Track Renewal (Up line 85mi 1327yds to 85mi to 267yds)
- Lanark services run mainline. Bus: Wishaw - Motherwell/Carluke
- Freight services run mainline through Motherwell
Main Worksites:
- Dyce: Raith's Farm
- Kittybrewster: rerailing
- Bus Between Aberdeen and Inverurie.
Saturday 1st - Monday 3rd December
Main Worksites:
- Huntly: Track Renewal (40mi 1709yds - 42mi 1360yds)
- Bus Between Inverurie and Keith, Trains retimed from Aberdeen and Inverness.
Saturday 8th - Sunday 9th December 2007
no major work
Sunday 16th December 2007
Main Worksites:
- Millerhill Yard: Track Renewal (Through Siding F7)
- Niddrie end of Milllerhill blocked. Any freight trains via Monktonhall Jn (with reverse at Drem if necessary).
Sunday 23rd - Monday 24th December 2007
Cross-Border Service Alterations:
- GNER trains start/terminate at Peterborough
Tuesday 25th December 2007 Christmas Day
Main Worksites:
- WCML 'Clyde Viaduct' (near Abington): Track renewal, Down line, 55m800y - 56m700y. (Mon 2230 to Thu 0640)
- No passenger trains running
Wednesday 26th December 2007 Boxing day
Main Worksites:
- Glasgow Central: Resignalling work (Tue 0035 to Thu 0500)
- Passenger service in SPT area only; 'Saturday service'.
- Glasgow Central (GLC) closed,
- Bus only: GLC - Whifflet, GLC - Paisley Canal, Shotts - Motherwell
- Bus: GLC - Crossmyloof (for East Kilbride/Kilmarnock trains)
- Bus: GLC - Pollokshields West (for Newton train)
- Bus: GLC - Pollokshields East (for Neilston trains)
- Bus: GLC - Paisley Gilmour Street (for Gourock, Wemyss Bay, Ardrossan, Largs and Ayr trains)
- FSR Christmas Service alterations
Main Worksites:
- Shields Junction: S&C renewals (Tue 0030 to Mon 7th Jan 0500)
- Bus: GLC - Paisley Gilmour Street (for Gourock, Wemyss Bay, Ardrossan, Largs and Ayr trains)
- No Access to Shields EMU Depot or Corkerhill DMU Depot.
- FSR Christmas Service alterations
Main Worksites:
- Edinburgh Waverley: OHLE works at West end (Mon 2330 to Sat 5th Jan 0430))
- Bay platforms 12,13,18 available from Thursday.
- Bay platforms 14,15,16,17, and lines X&Y through Mound tunnels blocked until 1st Jan.
- Edinburgh - Glasgow Queen Street: 1/2 hourly service.
- Haymarket/North Berwick trains start/terminate at Edinburgh Waverley.
- Fife Circle and Cowdenbeath trains start/terminate at Haymarket.
- NXEC and CrossCountry trains to/from Aberdeen/Inverness diverted via South Suburban line (do not call Haymarket).
- FSR Christmas Service alterations
Cross-Border Service Alterations:
- Virgin Trains: No trains to London Euston, start/terminate at Coventry
- Caledonian Sleepers: Diverted via ECML, reverse at Wembley for Euston.
Saturday 29th - Sunday 30th December 2007
Cross-Border Service Alterations:
- NXEC: Trains start/terminate at Newcastle (bus to Darlington)
Saturday 29th - Monday 31st December 2007
Cross-Border Service Alterations:
- Virgin Trains: No trains to London Euston, start/terminate at Coventry
- Caledonian Sleepers: Diverted via ECML, reverse at Wembley for Euston.
Saturday 29th - Monday 31st December 2007
Wednesday 2nd - Friday 4th January 2008
Main Worksites:
- Shields Junction: S&C renewals (Tue 25 Dec 0030 to Mon 7th Jan 0500)
- Bus: GLC - Paisley Gilmour Street (for Clyde Coast trains)
- No Access to Shields EMU Depot or Corkerhill DMU Depot.
- No Passenger service on 1st January
Main Worksites:
- Edinburgh Waverley: OHLE works at West end (Until Sat 5th Jan 0430)
- Bay platforms 14,15,16,17, and lines X&Y through Mound tunnels blocked
- Edinburgh - Glasgow Queen Street: 1/2 hourly service.
- Haymarket/North Berwick trains start/terminate at Edinburgh Waverley.
- Fife Circle and Cowdenbeath trains start/terminate at Haymarket.
- NXEC and CrossCountry trains to/from Aberdeen/Inverness diverted via South Suburban line (do not call Haymarket).
- 1st January: No First ScotRail trains, NXEC runnning South of Edinburgh only.
- FSR Christmas Service alterations
Engineering Works 2008
External Links:
- First ScotRail: Journey Check
- NXEC: Amended timetables
- Virgin Trains: Engineering Works
- CrossCountry: Travel Updates
- FTPE: Engineering Works
- National Rail: Planned Engineering Works
- Network Rail: Operational Rules (ROTP)
- ROTP: register of possessions 2007-08 (2mb PDF)
- ROTP: register of possessions 2008-09 (2mb PDF)